Project Description
Second storey 1000sqft deck resurface, our team removed deck floor railings and steps on existing wood deck and replaced it with high end composite materials.
Second storey 1000sqft deck resurface, our team removed deck floor railings and steps on existing wood deck and replaced it with high end composite materials.